3D Modelling
Planning, scheduling, budgeting, design and fabrication coordination, geometric layout and delivery of over 45,000 metric tonnes of steel for all major permanent and temporary works on the world’s longest, three-towered cable-stayed bridge. Rosewich’s co-founders managed all fabrication QA and geometry control during the balanced cantilever deck erection process, including the lifting engineering for the first 32 heavy lifts, as well as the procurement and on-site coordination of the cable-stay installation.